Case History - Using The Right Steel Shot
Author: Ervin Industries
Source: Ervin Industries, PO Box 1168, Ann Arbor, MI 48106
Doc ID: 1987006
Year of Publication: 1987
Abstract:
A big, big drop in shot consumption is just part of the story this Case History tells, after the gray-iron foundry customer involved switched from the use of USED (RECLAIM) SHOT to Ervin Industries' AMASTEEL SHOT. Feed-back from the customer shows shot consumption with AMASTEEL now averaging 22 tons per month, compared to 66 tons per month for all of 1986 with USED (RECLAIM) Shot.
| Download PDF |
|---|